> Gallery
JWC Grinder Rails in a Fiberglass Manhole
Description
Rails for a JWC Muffin Monster open channel grinder installed in an Openchannelflow fiberglass manhole. The grinder channel required an unusual bend in it to position the grinder inline with the piping. Around the grinder channel fiberglass flooring (benching) has been provided. Recessed fiberglass grating is installed over the upstream channel.
