> Gallery
Nearly Complete H-20 Manhole Installation
Description
A nearly completed installation of a H-20 traffic rated fiberglass flow metering manhole installation. The manhole has been installed and the manhole stack place on the manhole reducer. All that remains is the final slab pour around the manhole frame / cover.
